PROJECTS

PANAMA METRO

PREFABRICATED PLANT FOR LINE 3 UNDER BEAMS

Supply of personnel, plant adaptation and manufacture of concrete under beams, for the patio and garages of the Panama Metro – Line 3.

PATIOS AND GARAGES LINE 3

Removal of piles, assembly and pouring of pile caps for installation of under beams. Installation and fine adjustment of under beams, assembly and emptying of stop buffers. Supply of lifting equipment and heavy machinery. Supply of personnel for the execution of civil works, masonry, topography and electricity.

BEACH EXPRESSWAY

CHORRERA VIADUCT

Rental of lifting equipment for movement of material and assembly of structures.

VIA BRIDGE OF THE AMERICAS – ARRAIJÁN

EXPANSION 8 LANES

Rental of lifting equipment for movement of material and assembly of structures.

aDdress

Plaza Lucky, Local A6,
Nuevo Arraiján, Vía Interamericana.
Panamá

PHONES

+507 349-8717

+507 6208-5932| 6200-7780

FIND US

All rights reserved. Copyrights © 2024. ECP Equipment and Construction Panama, S.A. Privacy Policy.

Website developed by Social y Medio, Corp.

Abrir chat
Hola 👋
¿Dudas? Escríbenos al WhatsApp